• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MayorWatch

London News and Comment

  • NEWS
  • Twitter

Rotherhithe Tunnel Celebrates Centenary

June 11, 2008 - Staff

Tomorrow marks the 100th anniversary of the opening of the Rotherhithe Tunnel, one of the capital’s major crossings for traffic moving between the two sides of the River Thames.

Commissioned by the London County Council the tunnel was originally built for horse-drawn traffic at a cost of £2 million and was opened on 12th June 1908 by HRH the Prince of Wales.

According to Transport for London who now have responsibility for the tunnel more than 34,000 pass through it every day. Describing the construction of the tunnel as “a huge feat of engineering in its time” TfL’s Peter Brown says it “remains a vital link between north and south, though the type and volume of traffic has changed dramatically.

“Today, TfL engineers work tirelessly to ensure the tunnel can cope safely with the constant pressures associated with 34,000 vehicles a day, some 13 times greater than the volume of traffic it originally carried.”

Tunnel Statistics
The tunnel is 4,860 feet long, of which 1,500 feet are under the river, and has a 27 foot diameter.

Around 25,000 tonnes of cast iron, 20,000 tonnes of cement and half a million white glazed bricks were used in what was an extensive construction operation that also involved the displacement of nearly 3000 Londoners from both sides of the river.

Source: Transport for London

  • Click to share on Twitter (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Tumblr (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to print (Opens in new window)
  • Click to email this to a friend (Opens in new window)

RECENT UPDATES

TfL and Siemens unveil new Piccadilly line Tube train designs

852 new homes to be built in Acton by Transport for London

HGV operators in London urged to apply for a Direct Vision Standard permit

TfL proposes bus and tube cuts and annual fares increases to achieve long-term financial sustainability




Popular

1,700 extra Santander Cycles are coming to London’s streets

TfL confirms changes to Older Person’s Freedom Pass and 60+ Oyster card hours

TfL fares to rise in return for £1.6bn Government rescue package

Election for Mayor of London and London Assembly postponed until 2021

FEATURED

City Hall to move to Docklands as Mayor seeks to raise £55m for frontline services

‘Concern’ over TfL’s ability to deliver major projects in wake of Crossrail cost overruns

City Hall halts London Overground ticket office closures but many will still see opening hours reduced

Transport for London confirms bus cuts will go ahead despite passenger opposition

GOT A STORY?

As the original London news and scrutiny site we've been casting an eye over the capital's public services and politicians since 1999.

 

Many of our top stories started with a tip-off from a reader - if you've got something you'd like us to cover get in touch and we'll do the rest.

Stay In Touch

  • E-mail
  • RSS
  • Twitter

Copyright © 2021 MayorWatch Publications Limited · MayorWatch is Registered Trademark · All Rights Reserved · Contact Us · Terms of Use · Privacy Policy

MayorWatch Publications Limited · 20-22 Wenlock Road · London N1 7GU · Company Number 6291816

loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.